Important Notices:
1) Do not begin the installation before a minimum of 72 hours of product acclimation in the room where the flooring is to be installed
2) Ensure that the subfloor is adequate, well beveled, and dry, the humidity level in the subfloor must not exceed 12%
3) For installation over a concr…